한국오토 트레이드센터 설계
2017년 7월 26일
대구권 광역철도 사곡역사
2017년 9월 16일
Show all

장항선 개량 2단계 철도건설 웅천역사

Ungcheon Station

장항선 개량 2단계 철도건설 웅천역사 2017

Client :Korea Rail Network Authority
Location :Ungcheon-eup, Boryeong-si, Chungnam
Site Area :5,834.00㎡
Building Area : 1,029.70㎡
Building Coverage Ratio :17.65%
Floor Area Ratio :22.89%
Floors :2F
Parking Lots :34cars

Ungcheon Sub-station, the first impression of Boryeong
City that newly born tourist hub on the west coast, as a
connecting space between the stream of nature and the
city of Ungcheon, is reborn as a community recovery of
local resident.
The site is located on a slope overlooking the city center.
Adapting to the surrounding terrain and the new urban
system, It provides access, open views, and provides the
facilities for the service. Inter-programme through the
adjacent layout between connected facilities at the
center maximize synergies
서해안 관광 중심도시로 새롭게 태어나는 보령시의 첫인상으로서 웅천역사는 운봉산에서 내려오는 자연의흐름과 웅천도심을 잇는 연계의 공간으로 관광객에게 새로운 감동을, 지역주민에게 커뮤니티 회복의 장으로
새롭게 태어난다.대지는 웅천도심이 내려다보이는 경사지에 위치한다.주변 지형과 새로운 도시체계에 순응하는 공간배치를통해 접근성 및 열린 조망을 확보하고 역무시설을
중심으로 연계시설간 인접배치를 통해 프로그램간 시너지를 극대화한다.